ANNULAR SINTER PLANT

ANNULAR SINTER PLANT

Beijing, China
Yanqiang Hou
Contact person

Basic Information

Features:1 Burnt lime addition: Burnt lime addition into raw mix can increase the raw mix temperature, optimize the sintering process and ensure a stable and high productivity.. 2 Automatic weighing system: Automatic weighing system with accuracy of ±0.5% is applied so that the operation of equipment is much more reliable and the sinter product qualification rate is stepped up largely. 3 Thick layer sintering: The bed height on sinter machine can be 550-650mm, which shall reduce the fuel consumption, save operation cost and lower down FeO content in the sinter product. 4 Annular sinter machine: Since the pallet car rotating simultaneously with the wind box in annular sinter machine, air leakage rate is much lower so that the productivity is much higher. Normally, the productivity can be 1.8-2.0. Maximum productivity can be above 2.2. 5 Energy efficient ignition furnace: New type energy efficient ignition furnace is designed, including pre-heating, ignition and holding section. With this furnace, energy shall be saved, operation cost shall be reduced and sinter product quality shall be improved. Moreover, this new type furnace can be fired with various gas fuels, such as pure low CV BF gas, Light Diesel Oil and LPG. 6 Waste heat recovery system: The waste gas from the annular cooler shall be recycled for pre-heating the raw mix in the ignition furnace and hot blast sintering. Gas fuel consumption shall be reduced and operation cost shall be decreased. 7 Environmental protection: ESP with high de-dusting efficiency more than 99% is used for well protecting the environment. Water treatment system ensures that no effluent will be discharged out of the plant. 8 Automation: Advanced distributed control systems and PLC system brings about easy operation of the plant, so that staff requirement is lessened and running cost is lowered down.9 Comparison with linear sintering and winch driven sintering plant: Total investment is lower, civil work is less and construction period is shorter than linear sintering and winch driven sintering plant.

Delivery terms and packaging

Unfortunately the seller did not specify the terms of delivery. For more information, contact the seller.
Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1

    Дата события:

    12.10.2016 - 18.10.2016
    Catalog
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product